Centralized
Testing team member should follow below steps to execute Performance test
scripts from Global location.
Ø Identify
Global locations from Project team.
Ø Determine
SLA for each transaction in terms of response time.
Ø There
are 2 ways to simulate virtual user load from Global locations.
1.
Install
Load generators on different locations. :-
·
Identify Person from project team to
install load generator.
·
Identify machine having local admin
access.
·
Transfer Load generator setup.
Advantages: -
·
Performance test results are more
realistic and simulate real world scenario.
Disadvantages:-
·
Setup takes more time.
· Running multiple users on remote
generators harm production network bandwidth & users outside BASE Location face
network performance issue.
2.
Simulate
location bandwidth with in BASE solution center.
· Contact Network team at least one week in advance and notify them that Centralized
testing team is planning to run Performance test from Global location and
require help from network team to simulate Latency for global locations.
·
Provide list of Global locations to
network team.
·
Provide schedule to Network team so
that they can setup latency well in advance.
·
Provide 2 generators IP address to
network team.
Advantages: -
·
Setup is very easy and fits in tight
project schedule.
·
Running performance test will not
impact Production network bandwidth.
Disadvantages:-
·
As we are simulating latency in solution
lab there might be minor deviation in Performance test results from actual user
experience.
Ø Execute
the test.
Ø Once
test is over notify Network team to remove latency from generators.